Quikrete Home Additions & ADU: The Glendale Owner’s Guide
We build home additions and ADUs in Glendale using Quikrete concrete products for the foundation slabs, footings, and masonry work, and a finished addition typically runs $45,000 – $130,000 depending on size and site conditions. A detached ADU runs $90,000 – $220,000. We schedule free estimates, not same-day installs; an addition is a permitted, inspected build, and we pull every permit Glendale requires before we break ground.
Owners usually discover a concrete problem months after the pour. A hairline crack spreads across the slab where the patio addition meets the house. A footing settles and a door frame in the new room starts to stick. Or a do-it-yourself ADU pad fails inspection because the mix came in under the required strength. Quikrete is the concrete brand most Glendale homeowners end up holding a bag of, and the questions we get are always the same: which mix, how much, and who’s licensed to pour it right.
Which Quikrete Models This Applies To
Quikrete isn’t a machine with a model number stamped on it – it’s a family of bagged concrete and mortar products sold at every home center in Glendale, and the “model” that matters is the mix design. For foundation slabs and footings on an addition or ADU, the structural mix is typically Quikrete High Strength Concrete Mix or a ready-mix delivered by truck for anything over about 1 cubic yard. For small footings, piers, and post bases, the 80 lb. High Strength bag is common. Mortar for block work is a different product line (Mortar Mix or Type S), and the two don’t substitute for each other.
The gotcha we see in Glendale: Quikrete’s fast-setting products (Fast-Setting Concrete Mix) cure in about 20 – 40 minutes, which is great for a fence post and a disaster for a slab you need to screed and finish. Match the cure time to the job, not the shelf label. The real OEM-versus-aftermarket decision isn’t about the bag – it’s about the truck. For any slab over a cubic yard, a ready-mix supplier delivers a consistent, tested mix; bags are for small pours only.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Quikrete Home Additions & ADU Is Failing
Concrete failures show up slowly, and in Glendale the causes are specific to our soil and sun. Here’s what to look for:
- Cracks wider than a credit card, or growing. Shrinkage cracks are normal; a crack that widens over weeks usually means the subgrade wasn’t compacted or the slab lacks control joints. Glendale’s expansive clay soils move with the wet and dry seasons, and an under-built slab pays for it.
- A footing that settles or a new room that feels out of level. When the footing under an addition drops, doors stick and drywall cracks at corners. This points to a footing poured too shallow or on uncompacted fill.
- Efflorescence – white powdery staining on the slab or block wall. Moisture moving through the concrete leaves salt deposits. It’s cosmetic on a patio, but on an ADU foundation it can signal water intrusion from poor drainage.
- Spalling or surface flaking. In Glendale’s hot, dry summers followed by winter rain, a weak mix or a slab poured without curing compound will flake at the surface within a few years.
- A failed inspection on the ADU pad. If the mix didn’t reach the specified strength, the inspector will flag it. The permit inspector works for you, not for us – that’s why we want the pour tested and signed before anything gets framed.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
Here’s what a permitted home addition or ADU runs in Glendale, and where the money goes:
| Project | Installed range in Glendale |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
The range is driven by square footage, foundation depth (Glendale hillside lots need deeper footings and sometimes caissons), and whether the ADU is detached. Concrete is a real line item, but it’s only part of the story. What we do differently: the scope, every allowance, every price change arrives in writing before a single nail moves. If the slab spec changes mid-build, you get a written change order first. Every eligible job includes permits pulled and inspections signed, and the work is backed by our written 90-Day Done Right Promise.
DIY or Call Us?
Pouring a small Quikrete pad for a patio step or a shed is within reach for a careful homeowner who reads the bag and respects the cure time. What we’d genuinely caution against is pouring structural footings or an ADU foundation yourself. A foundation is buried, load-bearing, and inspected – get the mix design or the compaction wrong and the fix means demolition, not a patch. That’s also the part where Glendale permit rules are unforgiving, and an unpermitted foundation can sink your resale.
You can safely check the bag’s mix design, measure cracks, and photograph the footing before work begins. Where DIY goes wrong is under-mixing, pouring too thin a footing, or skipping subgrade compaction on our clay soil. If you’re weighing a real addition or ADU in Glendale, call (844) 560-4526 and we’ll walk the site together. Estimates are free, and we’ll tell you straight if the existing concrete can stay.
FAQs
A properly mixed, properly compacted Quikrete foundation can last 50 years or more. Bags mixed and poured to spec on a compacted subgrade are durable; the failures we repair in Glendale almost always trace to thin pours, poor drainage, or uncompacted clay soil, not the concrete itself.
Sometimes, yes. Minor shrinkage cracks and surface spalling can be patched or sealed. Structural settlement under an addition or ADU footing usually needs underpinning or partial replacement, which is where an inspection tells the truth. Call (844) 560-4526 for a free second opinion on any written estimate before you commit.
A garage conversion runs a few months; a detached ADU in Glendale can take six months to a year once permits, foundation, and inspections are counted. The concrete pour itself is a small slice of that timeline – the permits and framing carry the bulk of it.
We source the right mix for the application – bagged High Strength for small footings, tested ready-mix for anything over about a cubic yard – and we don’t carry parts on a truck. Call (844) 560-4526 and we’ll spec the mix and the pour in writing before the truck arrives.
Written by the team at Barrett & Sons Construction Glendale, serving Glendale and nearby areas.