Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Boral Home Additions & ADU: The Glendale Owner’s Guide
We build and finish Boral-spec home additions and ADUs in Glendale, and a full addition typically runs $45,000 – $130,000 installed, while a detached or attached ADU lands at $90,000 – $220,000 depending on size, foundation, and finish level. These are planned projects, so the timeline is set by permits and inspections, not by a same-day call. Most Glendale owners start asking questions when something in an existing addition fails: a roofline that sags after a wet winter, stucco cracking along a new-to-old wall joint, a sliding door that won’t latch because the header shifted, or a bump-out that never passed final inspection and now stalls a refinance.
Which Boral Models This Applies To
Boral makes exterior building products, not framed rooms, so “Boral” on an addition usually points to the cladding, trim, or roof tile that wraps the structure. The common lines Glendale owners ask about are Boral’s cultured stone veneer, its TruExterior trim and siding, and its clay and concrete roof tile. The right part is matched to the series, not to the color alone. Look for a stamp or label on the back of a stone piece or the mill mark on trim; measure the actual profile, because Boral runs more than one face width in the same color family. If the label is gone, a photo of the piece next to a tape measure tells us more than the name on the receipt.
On the OEM-versus-aftermarket call: for trim and stone veneer, a quality equivalent in the same dimension is often fine and costs less. For roof tile, matching the original profile matters, because a mismatched tile won’t interlock and will leak at the lap. We’re an independent Glendale service provider and not affiliated with Boral, so we’ll tell you honestly when a Boral-matched piece is worth the wait and when an equivalent does the job.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Boral Home Additions & ADU Is Failing
Addition and ADU failures usually show up at the seams, where new work meets old. These are the five we see most in Glendale:
- Stucco or trim cracking along the joint where the addition meets the original house. That seam moves with temperature and settling; a rigid patch cracks again within a season unless the joint is detailed to flex.
- Sagging roofline or a ridge that dips. Often a sign of undersized framing or a header that was never engineered, not a roofing-material problem at all.
- Water staining on ceiling drywall near the addition. Usually a flashing or roof-to-wall detail that was rushed, which Glendale’s rainy season finds every year.
- Doors and windows that stick or won’t latch in the new space. A shifting frame or a foundation that wasn’t pinned correctly to the main structure causes this.
- Stone veneer or tile coming loose. Poorly bonded veneer or tile set without the right WRB behind it traps moisture and pops off.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
Here’s how Glendale pricing runs on the work tied to a failing addition or a new one:
| Project | Installed range |
|---|---|
| Home addition (full) | $45,000 – $130,000 |
| ADU construction | $90,000 – $220,000 |
| Garage conversion to living space | $30,000 – $80,000 |
What drives the spread is square footage, foundation type, whether the structure is attached or detached, and finish level. Every scope, allowance, and price change arrives as a written change order before the work happens, so the number you sign is the number you pay. We pull the permits and get the inspections signed on every eligible job, and the finished work carries our written 90-Day Done Right Promise.
DIY or Call Us?
You can safely handle small things: caulking a hairline trim crack, photographing a failing seam, or measuring a stone or trim piece for a match. Where DIY goes wrong is structural. A sagging roofline, a header, a foundation that needs pinning, or a roof-to-wall flashing repair involves load paths and water management that a homeowner shouldn’t guess at, and a bad fix on an addition can cost far more to undo than to do right. The honest answer for anything structural or code-related is to bring in a licensed crew. For a free second opinion on any written estimate, call us at (844) 560-4526.
FAQs
A properly built and inspected addition or ADU should hold up 50 years or more, and Boral’s exterior products are engineered for decades of service. The lifespan depends less on the brand and more on the flashing, foundation, and framing behind it. Call (844) 560-4526 for a free estimate on your Glendale project.
Often yes. Seam cracking, flashing leaks, and loose veneer can usually be repaired without tearing down the addition, while a sagging structure or an unpermitted frame needs a closer look first. We’ll tell you which one you’re facing before any work starts. Call (844) 560-4526 for a free second opinion.
A repair can take days, while a full addition or ADU is a months-long project paced by permits and inspections, not by a same-day crew. We give you a realistic schedule in writing up front. Call (844) 560-4526 to talk through your timeline.
We match the part to your Boral series by label and measurement, then source the exact profile or a verified equivalent through our supplier network. You’ll approve the part in writing before it’s ordered. We also install and repair KraftMaid, Cambria, and Silestone finishes. Call (844) 560-4526 to schedule your free estimate.
Written by the team at Barrett & Sons Construction Glendale, serving Glendale and nearby areas.