Driveway & pavers
Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
PGT Driveway & Pavers: The Glendale Owner’s Guide
We install PGT-compatible driveway and paver systems in Glendale, and most full driveway projects run between $7,000 and $18,000 installed, depending on square footage, base prep, and the paver line you choose. Small repairs or resealing often land between $250 and $700. If you already know which component failed, call us at (844) 560-4526 and we’ll walk you through what a replacement actually looks like on your property.
Owners in Glendale usually discover a failing driveway surface the same way: a paver lifts after a hard rain, a section of joint sand washes out and won’t hold, or a hairline crack in the base layer widens over one dry season. PGT’s driveway and hardscape product line covers the pavers, base materials, edge restraints, and jointing components that hold a driveway together. When one of those parts fails, the whole surface starts moving.
Which PGT Models This Applies To
PGT’s hardscape and driveway line spans several product families, and the part you need depends on which paver profile and base system was originally installed. Older Glendale driveways from the 1990s and early 2000s often used a 60mm paver set over a compacted aggregate base; newer installations may use a thinner 40mm profile or a permeable system. The profile thickness determines which edge restraint and jointing sand you can use without the surface shifting.
To identify your exact part, check three things: the paver thickness (measure a lifted edge with a tape), the joint width (typically 3mm to 5mm on standard profiles), and any manufacturer stamp or lot code pressed into the paver underside. If a paver has no stamp, measure the length-to-width ratio and match it against PGT’s current catalog. In Glendale, we regularly see driveways from the Chevy Chase Canyon and Verdugo Woodlands areas where the original base used a specific aggregate mix that PGT no longer produces; the closest current equivalent requires adjusting the bedding layer to keep the surface stable.
On OEM versus aftermarket: for edge restraints and jointing sand, a quality aftermarket equivalent works fine and costs less. For pavers themselves, matching the OEM profile matters, because a slightly different thickness creates a trip edge and a drainage problem you’ll notice within a year.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your PGT Driveway & Pavers Is Failing
Here’s what a failing PGT driveway system looks like, and what’s usually causing it:
- Pavers lifting or rocking underfoot. The base layer has lost compaction, usually after water got under the surface through failed joint sand. Once the base moves, the pavers move with it.
- Joint sand washing out after rain. This is the earliest sign and the easiest to catch. When sand won’t stay in the joints, the edge restraint may have shifted or the drainage slope is off.
- Hairline cracks spreading across a section. Cracks in the paver surface often trace back to a base that wasn’t thick enough for the soil conditions. Glendale’s clay-heavy soil in some neighborhoods swells with moisture and pushes up against a thin base.
- Sunken areas or low spots holding water. Ponding after rain means the subgrade settled unevenly. This is a base problem, not a surface problem, and no amount of new joint sand will fix it.
- Edge movement along the driveway apron. The edge restraint or its stakes have loosened. Left alone, the pavers at the edge spread outward and the whole field opens up.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
Here’s what Glendale homeowners typically pay for driveway work involving PGT-compatible products:
- Paver driveway installation: $7,000 – $18,000
- Concrete driveway installation: $4,500 – $12,000
- Asphalt driveway paving: $3,500 – $9,000
- Driveway replacement: $5,000 – $14,000
- Driveway sealing: $250 – $700
- Paver patio installation: $3,500 – $11,000
The range depends on driveway square footage, how much base excavation is needed, slope and drainage corrections, and whether you’re matching an existing paver lot. Every one of those line items shows up in a written scope before we start, and any change to scope arrives as a written change order before the work happens. Permits are pulled and inspections signed on eligible jobs. We back every completed driveway with our written 90-Day Done Right Promise.
DIY or Call Us?
Some driveway checks are safe and sensible to do yourself. Walk the surface after a rain and note where water pools. Tap a few pavers with a rubber mallet to hear whether the base is hollow underneath. Measure your paver thickness at a lifted edge so you know what profile you’re matching. Those checks cost nothing and tell you a lot.
What goes wrong with DIY on driveway systems is base work. Replacing a paver or two over a failing base without fixing the base means the new pavers fail within a season. Excavating and recompacting a base by hand is heavy work, and getting the slope wrong creates a drainage problem that undermines everything you just installed. This isn’t a life-safety hazard the way a spring or a panel is, but it’s a job that costs more to redo than to do right the first time. Call us at (844) 560-4526 and we’ll tell you honestly whether your driveway needs a full rebuild or just a repair.
FAQs
How long do PGT driveway pavers last in Glendale’s climate?
A properly installed PGT paver driveway typically lasts 25 to 30 years in Glendale, provided the base is right and the joint sand is maintained. The dry, hot summers and occasional heavy winter rain accelerate joint sand loss, so plan on inspecting and topping off joints yearly. Call (844) 560-4526 for a free estimate on a full assessment.
Can a failing PGT driveway be repaired instead of replaced?
Yes, in many cases. Isolated paver failures over a sound base can often be repaired for a fraction of replacement cost, usually in the $250 – $700 range for sealing or spot repairs. If the base is compromised across a large section, replacement is the honest answer. Call us for a free second opinion on any written estimate you’ve received.
How long does a PGT driveway replacement take?
A standard residential driveway replacement in Glendale typically runs 3 to 5 days, including excavation, base prep, and paver setting. Larger driveways or sites with drainage corrections run longer. We’ll give you a written schedule before we start.
How do you source the right PGT part for my driveway?
We match your paver profile, joint width, and edge restraint by measuring the existing installation and cross-referencing PGT’s current catalog. If the original lot is discontinued, we find the closest current equivalent and explain the adjustment in writing before work begins. KraftMaid, Cambria, and Silestone are among the other brands we work with for interior projects. Barrett & Sons Construction Glendale is an independent service provider and is not affiliated with PGT.
If your driveway is shifting, settling, or losing joint sand every season, call Barrett & Sons Construction Glendale at (844) 560-4526 for a free estimate. We’ll walk the surface with you, tell you what the base is actually doing, and put the scope and price in writing before anything moves. Every job is backed by our 90-Day Done Right Promise, permits are pulled on eligible work, and a live person answers the phone 24 hours a day. Our technicians have up to 28 years of experience.
Written by the team at Barrett & Sons Construction Glendale, serving Glendale and nearby areas.