Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Beverly Hills
If you’re planning a room addition or an ADU in Beverly Hills, the honest timeline answer is this: the calendar is set by entitlement review and long-lead materials, not by how fast a crew can frame. The 90210 and 90212 postcodes cover some of the most architecturally significant housing stock in Los Angeles County, and the city treats each project as a design-review and inspection event before it treats it as a construction job. We’re Barrett & Sons Construction Glendale, and we build on that reality from day one. Call (844) 560-4526 for a free estimate and we’ll talk through your property, your drawings, and your realistic finish date.
Why Barrett & Sons Construction Glendale Is Beverly Hills’s Preferred Home Additions & ADU Company
Beverly Hills homeowners hire contractors and fire them for the same reason everyone else does – the difference is the size of the check when it goes wrong. We’ve built a reputation across this city by doing the two things most outfits skip: pulling every permit and putting every allowance on paper before deposits leave your account.
We’re owner-operated, founded in 1998, and Tom Barrett and his sons are on-site most days. That’s not a franchise dispatching strangers to your property. Our crew members are background-checked, and we carry a written 90-Day Done Right Promise on every construction and remodeling job: if it isn’t done right, Tom comes back and fixes it, one call.
Beverly Hills jobs get scrutiny from neighbors, inspectors, and design-review staff at every phase. We welcome that. The permit inspector works for you, not for us – that’s the whole point of the process. Every price change on a Beverly Hills addition arrives as a written change order before a nail moves, and we offer a free second opinion on any written estimate you’ve already received from another contractor.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in Beverly Hills
Beverly Hills additions and ADUs split into distinct tracks depending on your property type and lot. Here’s how the work actually breaks down when your Home Additions & ADU project is handled right from entitlement through final inspection.
ADU Design & Permitting in Beverly Hills
Design and permitting is where a Beverly Hills ADU is won or lost, and we front-load both before a drawing gets finalized. If your property sits on the city’s historic resources inventory or in the canyons above Sunset Boulevard, entitlement comes first: cultural heritage review for listed properties, and hillside ordinance grading limits plus a geological report for canyon lots. We sequence that work ahead of construction drawings so you don’t pay twice for revisions.

Garage Conversion ADU in Beverly Hills
A Beverly Hills garage conversion runs $30,000-$80,000 and often produces the most usable square footage per dollar on your lot. Detached garages in the older estate homes around Coldwater Canyon and Benedict Canyon can typically accommodate a full bathroom and kitchenette without touching the structural envelope. Converting means new electrical, plumbing rough-in, insulation, and fire-rated separation – all of it permitted and inspected.

New Detached ADU in Beverly Hills
A new detached ADU runs $90,000-$220,000 in this market, and the price spread comes largely from long-lead materials – custom cabinetry, architectural glass, specialty finishes – plus site work. On canyon lots above Sunset, grading limits and geological review add calendar, not just cost. We fix the scope, allowances, and draw schedule in writing first, then order, and hold specialty finishes until structural and foundation work is verified.

Junior ADU & Interior Conversion in Beverly Hills
A junior ADU inside an existing footprint is often the fastest legal path to a rentable or family-use unit, and it requires less site work than a detached build. The trade-off is that interior conversions in older Beverly Hills homes almost always surface dated electrical panels, plumbing that doesn’t meet current code, and foundation issues. Those get caught at inspection, so we scope them into the bid before the first wall opens.
Trusted Brands We Service in Beverly Hills
The finishes on a Beverly Hills addition are what the project is judged by, and we specify brands you can look up. Custom cabinetry in a Wellborn package, Cambria or Silestone countertops in the ADU kitchenette, and coordinating finish materials throughout the new space. Barrett & Sons carries that premium depth across every trade the work touches. We don’t stock parts on any truck – materials get ordered to the project spec, so the countertop you saw in the showroom is the one that shows up in your Beverly Hills ADU. Fast turnaround on standard orders; honest lead times on the custom pieces that set the schedule.
See the difference
Before
After
Before
After
Before
AfterCommon Home Additions & ADU Problems We See in Beverly Hills Homes
- Long-lead items ordered before scope is frozen. In Beverly Hills, custom millwork packages and architectural glass orders placed before design details are locked force expensive change orders when a sightline or cabinet run shifts during rough-in. The fix is committing the scope and allowance schedule in writing before deposits go out.
- Historic-preservation review discovered late. If your home sits on the city’s historic resources inventory, cultural heritage review can be triggered by a simple room addition – and that’s before a permit is issued. Entitlement gets treated as a formality too often, when it should be front-loaded before drawings are finalized.
- Hillside and geological review on canyon lots. Any project in the canyons above Sunset Boulevard hits the hillside ordinance’s grading limits, and most need a geological report. That’s calendar and cost the bid has to carry from the start.
- Fire-zone and seismic work value-engineered out. Ember-resistant vents, shear-wall retrofits, and foundation bolting get cut from bids to win on price, then forced back in at inspection sign-off. Beverly Hills’ dry summers and Santa Ana wind events make that fire-zone work non-negotiable, and the region’s seismic activity makes the structural work standard.
Pricing for Home Additions & ADU in Beverly Hills, CA
We publish real numbers because vague bids get you burned. A home addition in Beverly Hills runs $45,000-$130,000. An ADU runs $90,000-$220,000 depending on type and site. Garage conversions sit at $30,000-$80,000. Second-story additions run at the top of the range – the structural upgrade to carry a second floor plus the architectural glass and custom cabinetry that typically ship with it. Every price change during the job arrives in writing as a change order before work proceeds. That’s the 90-Day Done Right Promise and a written scope, both written on every contract. Call (844) 560-4526 for a free estimate.
| Service | Beverly Hills Range |
|---|---|
| Home Addition | $45,000-$130,000 |
| ADU Construction | $90,000-$220,000 |
| Garage Conversion | $30,000-$80,000 |
We Also Serve Cities Near Beverly Hills
We also take on additions and ADUs in West Hollywood, Culver City, Santa Monica, and Los Angeles, and the entitlement rules differ in each. If you’re comparing quotes across city lines, our Home Additions & ADU in Beverly Hills page mirrors this one but the local review requirements don’t. Call for a free second opinion on any written estimate you’re weighing for one of these cities, or reach out to our Home Additions & ADU team directly.
Serving Beverly Hills, CA – Our Local Coverage Area
We serve Beverly Hills and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in Beverly Hills
Because the calendar in Beverly Hills is set by entitlement review and long-lead custom materials, not by labor. Cultural heritage review, hillside ordinance grading limits, geological reports, and design review all add phases a neighboring city may not require. Then the custom millwork and architectural glass orders run their lead times, and those numbers are longer than framing. Call (844) 560-4526 for a realistic schedule on your property – estimates are free.
Yes – if your property is listed on the city’s historic resources inventory, even a simple room addition can trigger mandatory cultural heritage review before a permit is issued. That review typically happens before construction drawings are finalized, which means it belongs at the front of the project, not the back. We sequence entitlement work ahead of ordering and hold specialty finishes until structural and load-bearing work is verified. Call us for a free second opinion on any written estimate.
Through a written scope, written allowances, and written change orders before ordering – not through a locked-in number that hides the finish choices. On this tier, the allowances for cabinetry, glass, and specialty finishes are the largest living variable in the budget. We fix every allowance on the contract in writing, sequence permits and inspection sign-off ahead of ordering, and issue every price change as a written change order. Call (844) 560-4526 for a free estimate with the allowances spelled out.
Plan on ember-resistant vents, fire-resistant materials where the hillside risk runs high, and seismic work: shear-wall retrofits and foundation bolting. Beverly Hills’ dry summers and Santa Ana wind conditions make the fire-zone upgrades practical necessities, and seismic activity in the region makes the structural work standard on any addition. Those items belong in the initial bid, not value-engineered out. Call us for a free second opinion on your written estimate.
Four things: a plan check with the city, permit issuance, a fixed scope with written allowances, and design review where your property requires it. Canyon lots above Sunset Boulevard also hit the hillside ordinance grading limits and a geological report. Garage conversions add fire-rated separation between the unit and the main house. A written scope and free estimate are the first step – call (844) 560-4526.
Written by the team at Barrett & Sons Construction Glendale.